ASTM E330 PDF DOWNLOAD

adminComment(0)

This standard is issued under the fixed designation E ; the number immediately following the designation indicates the 1 This test method is under the jurisdiction of ASTM Committee E06 on Downloaded/printed by. ASTM-Epdf - Download as PDF File .pdf), Text File .txt) or read online. TEST PROCEDURE: The structural test was per ASTM E "Standard Test Method for Structural. Performance of Exterior Windows, Doors, Skylights and.


Astm E330 Pdf Download

Author:HIEDI MARANI
Language:English, Indonesian, Japanese
Country:Mauritania
Genre:Academic & Education
Pages:101
Published (Last):29.04.2016
ISBN:852-4-39299-665-6
ePub File Size:22.86 MB
PDF File Size:16.11 MB
Distribution:Free* [*Sign up for free]
Downloads:38530
Uploaded by: GERMAN

ASTM E —02 Test Method for Structural Performance of Exterior This convenient option is a searchable PDF download that requires a PDF Reader. ASTM E/EM in English | Standard Test Method for Structural Performance of Exterior Windows, Doors, Skylights and Curtain Walls by Uniform Static. Astm E 96 documents PDFs Download. July 13th, - astm e 96 PDF download TESTED TO ASTM E E 96 E 96 AND E

Where the largest system or building wall is smaller than that required herein, the largest system or full size building wall shall be tested. See Figs. Separate tests of anchorage systems using the actual anchor substrates shall be conducted when specified.

If an adequate air supply is available, a completely airtight seal need not be provided around the perimeter of the test specimen and the mounting panel, although it is preferable.

However, substantial air leakage will require an air supply of much greater capacity to maintain the required pressure differences. Calibration of manometers and mechanical deflection measuring devices are normally not required, provided the instruments are used at a temperature near their design temperature. Required Information Fit the specimen into or against the chamber opening. The outdoor side of the specimen shall face the higher pressure side for positive loads; the indoor side shall face the higher pressure side for negative loads.

You might also like: EN 10025-3 PDF DOWNLOAD

Support and secure the specimen by the same number and type of anchors used in installing the unit in a building, or if this is impractical, by the same number of other comparable fasteners, located in the same way as in the intended installations. The means to stop air leakage shall not restrict any relative movement between specimen components. As an alternative, cover the entire specimen and mounting panel with a single thickness of polyethylene film no thicker than 0.

The technique of application is important to ensure that the maximum load is transferred to the specimen and that the membrane does not prevent movement or failure of the specimen. Apply the film loosely with extra folds of material at each corner and at all offsets and recesses. When the load is applied, there shall be no fillet caused by tightness of plastic film.

For operable specimens, open, close, and lock each ventilator, sash, or door five times after adjustments and prior to testing.

Compliance and Testing Reports

Release the pressure difference across the specimen NOTE 1Width of typical specimen if no corners are included in system or project. NOTE 2Include vertical expansion joint corners and end jamb conditions in test specimen if such items are part of system or project wall. If water testing is to be performed, place one expansion joint in lower third of specimen. NOTE 3See 8. NOTE 3Since performance is likely to be a function of size and geometry, select specimens covering the range of sizes to be used in a building.

In general, it is recommended that the largest size or most heavily or critically loaded of a particular design, type, construction, or configuration be tested. It is also recommended that the largest lite or panel in a system or building be used at each side of a horizontal or vertical framing member.

The glass in a specimen should be of the same thickness and heat-treatment condition as to be used in the system or building. Glass stronger than that to be used in a system or building should not be used in a test specimen. Practice E should be used to verify that the selected glass will meet the specified loads. Fully sealed roof coping details do not have to be included in a specimen unless specified. Calibration 9.

Popular Publishers

The recovery period for stabilization shall not be less than 1 min, nor more than 5 min at zero load. If the breakage was caused by deformation or failure of the supporting frame of the glass, by loosening or failure of any fasteners, or by damage to the glass caused by interaction between the glass and its supporting elements, record the findings and discontinue the test. If the breakage was not caused by any of the above named structural problems, replace the glass using the original fasteners and continue the test at the load where glass breakage occurred.

If new structural elements or fasteners are used instead of the original ones, repeat the entire test. The recovery period for stabilization shall not be less than 1 min nor more than 5 min at zero load. Record deflection readings.

Release the pressure difference across the specimen and, after a recovery period to allow stabilization of the test specimen, zero-out deflection-measuring devices.

If new structural elements or fasteners are used instead of the original ones, repeat the entire test. The test chamber or the specimen mounting frame, or both, must not deflect under the test load in such a manner that the performance of the specimen will be affected.

These notes and footnotes excluding those in tables and figures shall not be considered as requirements of the standard. Provide a static pressure tap to measurethe pressure difference across the test specimen.

The system shall provide an essen-tially constant air-pressure difference for the required testperiod. For this reason, the strength of an assembly satm tested for the actual time duration to which it would be exposed to a sustained or a gust load, or both, as discussed above.

When the load is applied, there shall be no fillet caused by tightness of plastic film.

Considerable energy and hazard are involved at the pressures used in this test method. Framing Construction Historical Version s - view previous versions of standard.

The specifier shall determine the number of increments to be used in this test, not to be less than four approximately equal increments to maximum test load. The specimen may or may not truly represent every aspect of the actual structure.

ASTM E330-02

Referenced Documents download separately The documents listed below are referenced within the subject standard but are not provided as part of the standard. LazarasBenny Isprithiyone. Thus a safety factor is incorporatedin the testing. The resistance of many windows, curtain walls, and door assemblies to wind loading is also complex and depends on the complete history of load, magnitude, duration, and repetition.

Skip to the beginning of the images gallery.

Separate tests of anchorage systems using the actual anchor substrates shall be conducted when specified.

California California Codes California Codes. Ifwater testing is to be performed on the test specimens, at leastone full horizontal joint accommodatin.

Ventilated Façades

Standards Subsctiption may be the perfect solution. Referenced Documents download separately The documents listed below are referenced within w subject standard but are not provided as part of the standard.

Other examples of materials and test conditions that may not meet the requirements are discussed in Section 6. Aztm is a gravimetric test that monitors the change in moisture content over astm d Immersion in a liquid bath should be used to simulate vapor exposure only when apparent absorption properties are desired for qualitative purposes.

Customers Who Bought This Also Bought

The specimens are then dried, removed from the drying oven, and allowed to cool in a desiccator. Whether your business is local or global, we can ensure your products meet quality, health, environmental, safety, and social accountability standards for virtually any market around the world.

Combining values from the two systems may result in nonconformance with the standard.

Select from list below: While the test procedures themselves may be used for multi-phase materials, the calculations used to determine the moisture diffusivity constant in Procedure A are applicable only to d materials. Due to the very large number of tests offered, descriptions of those most commonly requested have been gathered into the following groups: Within ASTM D there are three other procedures covering material conditioning within a specific moisture environment.

Also covered are procedures for conditioning test coupons prior to use in other test methods; either to an essentially moisture-free state, to equilibrium in a standard laboratory atmosphere environment, or to equilibrium in a non-laboratory environment. The specimens are removed from the conditioning environment periodically, allowed to equilibrate to room temperature in a astm d container, and weighed.

Other examples wstm materials and test conditions that may not meet the requirements are discussed in Section 6. The side edges are then sealed to prevent moisture absorption through the sides. Evaluating how your products and services meet and exceed quality, safety, sustainability and performance standards.

Also included are procedures astm d determining the moisture loss during elevated temperature testing, as well as moisture loss resulting from thermal exposure after removal from the conditioning environment, such as during strain gage bonding.Published November Thus a safety factor is incorporated in the testing.

Differential3 1. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applica- bility of regulatory limitations prior to use. For test loads that represent design loads other than wind, such as snow load, consideration shall be given to establish an appropriate test period for both design and proof load testing. Complexities of wind pressures, as related to building design, wind intensity versus duration, frequency of occurrence, and other factors must be considered.

BARBRA from Phoenix
I do relish wetly. Feel free to read my other articles. I absolutely love needlepoint.
>